fbpx

All our bathroom packages are on display in our Fife showroom.

  • Any tap, any shower, any tile
  • Great customer support!
  • Hundreds of 5 Star Customer Reviews
  • Showroom open 7 days a week
  • Including lots of customisations and combinations.

Isla bathroom package

Contemporary designer bathroom with grey marble effect tiles.  Complete with gloss white modular furniture and an L shaped shower bath to suit all the family.

Isla

What’s included in the Forth complete bathroom package?

  • L Shape Shower Bath, Bath Front Panel and Shower Screen

  • Twin Thermostatic Combination Shower

  • Bath and Basin Mixer Taps and Wastes

  • Bathroom Furniture including WC Unit, Vanity Unit and Tall Storage Cupboard

  • Back to wall pan with soft close seat, Concealed Cistern and Vanity Basin

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £6,000

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Forth complete bathroom package is one of the most popular packages in our Stirling showroom.

Below we have included further information for customers purchasing the Forth complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Fyne bathroom package

Modern family bathroom comprising Carron bath, thermostatic shower over bath, curved shower screen and LED mirror. Modular furniture in various colours and finished. Complete with ultra modern rimless WC.

What’s included in the Annan complete bathroom package?

  • 1700mm Single Ended Bath, Bath Front Panel and Shower Screen

  • Modern Square Thermostatic Shower

  • Square Style Bath and Basin Mixer Taps and Wastes

  • Bathroom Furniture including WC Unit, Vanity Unit, Worktops, Plinth and Handles

  • Back to wall pan with soft close seat, Concealed Cistern and Vanity Basin

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling. Feature tiles included.

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £6,000

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Annan Complete Bathroom Package is a beautiful bathroom set with modern furniture and tiles.

Below we have included further information for customers purchasing the Annan complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Garry bathroom package

Clean, crisp modern bathroom complete with Carron twin grip bath, thermostatic shower over bath and shower screen.  Fitted furniture with semi-recessed basin, LED mirror and rimless VC.

What’s included in the Tweed complete bathroom package?

  • 1700mm Carron Twin Grip Bath, Bath Front Panel and Folding Shower Screen

  • Modern Thermostatic Shower

  • Designer Bath and Basin Mixer Taps and Wastes

  • Bathroom Furniture including WC & Vanity Unit

  • Back to wall pan with soft close seat, Concealed Cistern and Vanity Basin

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling. Includes feature tiles.

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £5,500

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Tweed complete bathroom package is a beautiful bathroom set at a very competitive price.

Below we have included further information for customers purchasing the Tweed complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Eden bathroom package

Stunning, modern bathroom complete using a double ended Carron bath, shower handset, beautiful wood effect modular furniture, LED mirror and rimless WC. Finished off with warm tiles and wood effect tile on the floor.

What’s included in the Carron complete bathroom package?

  • 1700mm Rounded End Carron Bath, Bath Front Panel and Modern Shower Screen

  • Modern Twin Thermostatic Shower

  • Designer Bath and Basin Mixer Taps and Wastes

  • Modern Pan, Cistern, Soft Close Toilet Seat, Vanity Unit and Basin

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling. Including feature tiles.

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £5,400

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Carron complete bathroom package is one of the most popular packages in our Stirling showroom with stunning tiles.

Below we have included further information for customers purchasing the Carron complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Devon bathroom package

Modern grey bathroom complete with Carron bath, modular furniture, LED mirror and rimless WC.

What’s included in the Spey complete bathroom package?

  • Modern Large Double Ended Bath

  • Bath Mixer with Shower Attachment, Basin Mixer Taps and Wastes

  • Bathroom Furniture including WC Unit, Vanity Unit & Basin

  • Back to wall pan with soft close seat, Concealed Cistern and Vanity Basin

  • Bluetooth Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £5,500

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Spey complete bathroom package makes a statement with the bath boxed and tiled in.

Below we have included further information for customers purchasing the Lomond complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Almond bathroom package

Family bathroom complete with Carron bath, black thermostatic bar shower, combination vanity unit set with rimless WC.  This is finished off beautifully with a lovely round LED mirror.

What’s included in the Findhorn complete bathroom package?

  • 1700mm Single Ended Bath, Bath Front Panel and Modern Curved Shower Screen

  • Modern Thermostatic Shower

  • Designer Waterfall Bath and Basin Mixer Taps and Wastes

  • Modern Pan, Cistern, Soft Close Toilet Seat, Basin and Pedestal

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling. Including mosaic feature.

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £4,750

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras

All our bathroom packages are on display in our Stirling showroom.

The Findhorn complete bathroom package is the most competitive in our Stirling showroom with stunning tiles.

Below we have included further information for customers purchasing the Findhorn complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Book your FREE no obligation BATHROOM Survey today!

TOP