fbpx

Otterston Bathroom Package - only £9250

Complete bathroom packages with baths

Complete bathroom packages with shower enclosures

Complete Bathroom Packages with a Bath and a Shower Enclosure

Otterston complete bathroom package

  • 1000mm Quadrant Shower Enclosure with 8mm Safety Glass Enclosure
  • Black Twin Thermostatic Dual Head Deluge Shower
  • 1700 x 700 Carron Round Edge Double Ended Bath
  • Black Basin & Bath Mixer Taps with Waste
  • Bathroom Furniture including WC Unit, Vanity Unit & Basin with Choice of Colours
  • Rimless Comfort Height pan with soft close seat
  • Black Led Mirror and Designer Heated Towel Rail with Valves
  • Up to 28m2 of Wall and Floor Tiling
  • Bathroom Accessories
  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

BOOK A BATHROOM SURVEY

You can quickly and easily book an appointment using our booking calendar. We can visit you at home or you can come into our showroom if you feel more comfortable.

Pick a date, time and select your preferred choice of appointment.

BOOK A HOME SURVEY

All this for only £9,250

  • Complete fitting service

    Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras. The Forth complete bathroom package is one of the most popular packages in our Stirling showroom. Below we have included further information for customers purchasing the Forth complete bathroom package.
  • What is the process of a standard bathroom installation?

    This is a question we are often asked. From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks. From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.
  • We leave you a usable toilet in every night

    This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

MORE BATHROOM PACKAGES

Earn

Complete bathroom package

Otterston

Complete bathroom package

Book your FREE no obligation BATHROOM Survey today!

TOP